Fujimino City and Kawagoe City will conduct joint operational training for their drainage pump vehicles on May 20, 2026. The training aims to prepare for potential flooding caused by heavy rains by ensuring swift and accurate deployment of drainage equipment. The vehicles used have a total weight of 8 tons and a drainage capacity of 30 tons per minute.
FACT BOX
- Source: PR TIMES
- Category: Event