A pantograph malfunction on the Puyuma Express train (No. 402) occurred at 8:44 AM today at kilometer 30.520 near Fonglin Station on the Hualien-Taitung Line. Due to this power equipment failure, single-track, bi-directional operations using the eastern main line have been implemented between Shoufong and Fonglin stations since 9:45 AM, resulting in delays of about 10 to 15 minutes for all trains on both up and down lines.

Taiwan Railways Administration (TRA) has established a Level 1 emergency response team and dispatched a power maintenance vehicle to patrol the affected section. Passengers from the disabled Puyuma Express (No. 402) are being transferred to train No. 406 at Fonglin Station. Train No. 402 will be operated with a separate formation departing from Taitung Station.

TRA is currently managing single-track, bi-directional operations in the Shoufong to Fonglin section, causing trains to travel at reduced speeds and experience delays of approximately 10 to 15 minutes. The emergency response team has been activated, and a power maintenance vehicle is inspecting the line.

FACT BOX

  • Source: CNA (Central News Agency)
  • Category: Taiwan