Kobe Rokko Railway Co., Ltd. (Headquarters: Nada Ward, Kobe City, President: Naoya Kawabe) has been carrying out renovation work on the Rokko Cable Car vehicles and station facilities in two phases over two years starting in 2025, with the aim of improving safety and services. Due to the second phase of construction, the Rokko Cable Car (between Rokko Cable Shita Station and Rokko Sanjo Station) has been suspended since January 5, 2026 (Monday), with substitute transportation by bus etc. being provided. We are pleased to announce that the Rokko Cable Car will resume operations upon completion of the second phase of construction.

1. Resumption Date From the first train on April 11, 2026 (Saturday) (7:10 departure) *Substitute transportation by bus etc. will end after the last service on April 10, 2026 (Friday).

2. Schedule After Resumption In principle, the same as before. *First train 7:10, 7:40, then every 20 minutes until 20:40, last train 21:10. However, on weekdays (excluding holidays) during the 12:00 hour, the interval will be 30 minutes (previously, only Tuesdays had a 30-minute interval during the 12:00 hour).

3. Main Construction Work Performed in Phase 2 ・Renewal of floor materials and seat surface materials for observation cars (2 cars), and acrylic roof renewal for one observation car. ・Repainting of the exterior of two vehicles. ・Renewal of the underframe for two vehicles. ・Construction of a new vehicle inspection pit at Rokko Cable Shita Station.

4. Inquiries Kobe Rokko Railway Co., Ltd. Transportation Department Sales Division (9:00 - 18:00) (Phone) 078-861-5288

Reference Materials: d5180-3568-dcf06bf0880e3363e1e6d80f608f9f38.pdf

Kobe Rokko Railway Co., Ltd. https://www.rokkocable.com/

Release https://www.hankyu-hanshin.co.jp/release/2026/03/c67f1522d9dcbab5db27fe5bd8694cf42ac02238.pdf

Issued by: Hankyu Hanshin Holdings...

FACT BOX

  • Source: PR Times
  • Category: News