Nippon Chikudenchi Co., Ltd. (Headquarters: Chiyoda-ku, Tokyo; President: Shuichi Urushibara) announces that it has begun installing grid-scale batteries at the NC Choshi Kasugacho Storage Station (located in Choshi City, Chiba Prefecture), which it is developing.

Amid the push for carbon neutrality and the expansion of renewable energy introduction, securing 'adjustment capacity' essential for stable power supply has become a critical social issue.

In its grid-scale battery storage business, the company consistently manages everything from selecting suitable land, coordinating with power companies and handling necessary procedures, selecting and introducing optimal battery storage solutions, to constructing the storage station.

【Facility Overview】

Facility Name: NC Choshi Kasugacho Storage Station Location: Choshi City, Chiba Prefecture Construction Company: Suzuki Electric Co., Ltd. Installation Start Date: May 7, 2025 Primary Use: Supply-demand adjustment market, JEPX (wholesale market), capacity market response, renewable energy output leveling

【Company Overview】

Nippon Chikudenchi Co., Ltd. Company Name: Nippon Chikudenchi Co., Ltd. Representative: President Shuichi Urushibara Location: Kasumigaseki Building 13F, 3-2-5 Kasumigaseki, Chiyoda-ku, Tokyo Business: Development and operation of grid-scale battery storage facilities URL: https://nipponchikudenchi.co.jp

Suzuki Electric Co., Ltd. Company Name: Suzuki Electric Co., Ltd. Representative: President Daisuke Suzuki Location: 565-3 Sankucho, Nasushiobara City, Tochigi Prefecture Business: Electrical construction, facility construction, energy system business, switchboard design and manufacturing URL: https://suzuki-denki.co.jp/

FACT BOX

  • Source: PR TIMES
  • Category: Event